The Millennium Bridge will be closed for four days next week to allow for inspection.
The bridge, which links St Paul’s with Tate Modern, will be closed between 10am – 4pm on October 18th, 19th, 20th, and 21st.
The bridge was opened in 2000 and quickly became known as the Wobbly Bridge. Work was undertaken to and it reopened without its Wobble in 2002.